Skip to main content
0
ResidentialSteelFraming.com

Cut Framing Time & Labor Cost

What is included:

  • Architectural Set (Floor Plan, Roof Plan, Elevation, Section, Door & Window Schedule, Typical Details)
  • 50 Years of Warranty
  • Pre-Assembled Metal framing for Internal, Exterior Walls & Roof

What is Excluded:

  • State Taxes
  • Shipping kit to site
  • Structural plans
  • Permitting set

Cut Framing Time By 75%

  • We provide pre-assembled metal stud walls to your site. You will not need cut and stack individual studs and tracks on job site and finish projects faster.
  • Highly experienced in-house manufacturing and panel assembly team working in a controlled factory set up for utmost precision and quality.

Cut Construction Waste and Loan Interest %

  • Quicker Installation & Erection of steel panels help reduce the building timeline.
  • Panels are labeled to identify modules faster on the site.
  • Avoid delays due to bad weather.
  • Custom Engineering & Pre-assembled reduces the chances of on-site errors.

Lego- Like Erection Sequence

  • Comes with Step by step installation instructions.
  • The panels are labeled for easy identification and positioning.
  • Easy-to-understand instructions for assembling & screwing.
  • Alignment guides for pre-plumbing, electrical, HVAC, doors, and windows to reduce errors in execution.

Clash-Free Steel Panels

  • The panel design process includes Clash Detection.
  • Identifies gaps/clashes in software before manufacturing.
  • Resolves identified clashes and prepare Clash free 3D model.
  • Preparing 100% coordinated Field Execution Plans/ Shop drawings.
  • Resulting in Zero-decision making on-site and no band-aid decisions.

Inclusions:

  • Walls with openings
  • Sub-floor framing
  • Roof framing
  • Connectors (Metal L and Metal sheet plate only)
  • Standard Pre-Punched Holes for electrical and plumbing.
  • Lego-like erection sequence for onsite installation.
  • All steel material will be as per structural plans.
  • Free phone support

Exclusions:

  • On-site installation.
  • OSB or any Steel Sheathing.
  • Any special connector
  • Simpson’s or any other strong walls.
  • Staircase
  • Screws, holdowns, hangers etc
  • Warehouse / storage.
  • Any extra framing or backings for cabinetry, HVAC, ceiling drops etc.
  • MEP Engineering
  • Foundation design
  • Sales Tax

Leave a Reply